Lead Times: MACH II™ 5", 6", 5"/6" Gutter Machines: 4 weeks | SSQ II™, SSH™, and SSR™ Roof Panel Machines: 42 weeks | SSH™, SSR™, and SSQ II™ Roller Sets: 6-8 weeks

*Lead times are subject to change. Learn more here.

How to Change Coil Widths for a Portable Roof Panel Machine

When changing coil widths, there are several adjustments that need to be made throughout your portable rollforming machine. In this video, Chuck Burch from the New Tech Machinery Service department demonstrates how to adjust the entry guide, left side tooling, rib rollers, and more. If by chance we didn’t answer your question in this video, you can contact us here.

Machine should never be operated without the guards in place. Otherwise severe injury can occur. Machine must be operated by a competent trained individual and never be operated by a person who has not had proper training, studied the video and the latest operating manual found here. Failure to operate correctly or without guards can result in severe injury.