Lead Times: 2-3 weeks for MACH II™ 5", 6", and 5"/6" Combo Gutter Machines | 20-22 weeks for SSQ II™ MultiPro, SSH™ MultiPro, and SSR™ MultiPro Jr. Roof Panel Machines | 3-4 weeks for SSH, SSR, and SSQ II machine roller sets. *subject to change

SSQ550 – 1.5″ Snap-Lock

Panel seam: 1 1/2” high

Panel material: 28 ga. to 22 ga. steel (painted, Galvalume, coated galvanized), .027″ to .040″ aluminum (painted), and 16 oz. to 20 oz. 3/4 hard copper

Panel coverage: 12” to 24”

Machines that make this profile: SSQ II