Lead Times: MACH II™ 5", 6", 5"/6" Gutter Machines: 4 weeks | SSQ II™, SSH™, and SSR™ Roof Panel Machines: 40 weeks | SSH™, SSR™, and SSQ II™ Roller Sets: 6-8 weeks
Programmable Logic Controller – Operation of the controller is designed for simplicity, with help and error screens to assist the user.