Lead Times: MACH II™ 5", 6", 5"/6" Gutter Machines: 4 weeks | SSQ II™, SSH™, and SSR™ Roof Panel Machines: 42 weeks | SSH™, SSR™, and SSQ II™ Roller Sets: 6-8 weeks
$1,950.00
DC Motor and control to allow operation of machine with 12 volt battery. (Battery not included).