Lead Times: 3 weeks for MACH II 5", 6", and 5"/6" Combo Gutter Machines, 11 weeks for SSQ II MultiPro, SSH MultiPro, and SSR MultiPro Jr. Roof Panel Machines, and 6-8 for SSH, SSR, and SSQ II machine roller sets. *subject to change

WAV-16-4F Profile With Flange

Panel material: 24 ga.-22 ga. painted steel, .032”-.040” painted aluminum

Panel coverage: 16″

Machines that make this profile: WAV Wall Panel Machine