Lead Times: 3 weeks for MACH II 5", 6", and 5"/6" Combo Gutter Machines, 11 weeks for SSQ II MultiPro, SSH MultiPro, and SSR MultiPro Jr. Roof Panel Machines, and 6-8 for SSH, SSR, and SSQ II machine roller sets. *subject to change

T-Panel

Panel seam: 1/2” to 2” (leg height is profile dependant)

Panel material: 28 ga. to 22 ga. steel (painted, Galvalume, coated galvanized, aluminized)*, .027″ to .040″ aluminum/painted, and 16 oz. to 20 oz. 3/4 hard copper

Machines that make this profile: SSQ II, SSH, and SSR