Lead Times: MACH II™ 5", 6", 5"/6" Gutter Machines: 4 weeks | SSQ II™, SSH™, and SSR™ Roof Panel Machines: 42 weeks | SSH™, SSR™, and SSQ II™ Roller Sets: 6-8 weeks

*Lead times are subject to change. Learn more here.

MG6-SB6 – 6″ with Straight Back

Gutter material: 30 ga. to 24 ga. steel (painted, Galvalume, coated galvanized), .019“ to .032” painted aluminum, or 16 oz. to 20 oz. copper 3/4 hard

Gutter size: 6″

Machines that make this profile: MACH II 6” and MACH II 5”/6”