Lead Times: 1-2 weeks for MACH II™ 5", 6", and 5"/6" Combo Gutter Machines | 20-22 weeks for SSQ II™ MultiPro, SSH™ MultiPro, and SSR™ MultiPro Jr. Roof Panel Machines | 3-4 weeks for SSH, SSR, and SSQ II machine roller sets. *subject to change

MG6-HK6 – 6″ with Alcoa Hook

Gutter material: 30 ga. to 24 ga. steel (painted, Galvalume, coated galvanized), .019“ to .032” painted aluminum, or 16 oz. to 20 oz. 3/4 hard copper

Gutter size: 6″

Machines that make this profile: MACH II 6” and MACH II 5”/6