Lead Times: 5 weeks for MACH II™ 5", 6", and 5"/6" Combo Gutter Machines and 14 weeks for SSQ II™ MultiPro, SSH™ MultiPro, and SSR™ MultiPro Jr. Roof Panel Machines. *subject to change

How to Set Up a Limit Switch on a Roof Panel Machine

A limit switch automatically stops the machine from running out a panel when it reaches a ceratin length. Watch this video to learn how to properly setup a limit switch on your machine.