Lead Times: MACH II™ 5", 6", 5"/6" Gutter Machines: 4 weeks | SSQ II™, SSH™, and SSR™ Roof Panel Machines: 42 weeks | SSH™, SSR™, and SSQ II™ Roller Sets: 6-8 weeks

*Lead times are subject to change. Learn more here.

UNIQ® Automatic Controller 2.1.6: Push-Button Panel Tutorial

The UNIQ Automatic Control System has both an intuitive touch screen and a push-button panel designed to give you options for automatic and manual control.

In this tutorial, Bryan Yancy from the New Tech Machinery service department demonstrates how to operate manual mode using the push-button panel. Watch this video to learn how to turn on the machine, jog/run material from the entry and exit ends, operate the shear, and more.

Click here to contact us at NTM!