Lead Times: 1-2 weeks for MACH II™ 5", 6", and 5"/6" Combo Gutter Machines | 20-22 weeks for SSQ II™ MultiPro, SSH™ MultiPro, and SSR™ MultiPro Jr. Roof Panel Machines | 3-4 weeks for SSH, SSR, and SSQ II machine roller sets. *subject to change
Forms 1” or 1 ½” flange on back of 5” or 6”gutter eliminating
the need for flashing. Used with 5” or 6” machine only.